Interview: The boom in offshore

With offshore wind installations growing in size, scope and depth, the industry needs every advantage that new developments in technology can offer. High Wind and the Boom Lock system is focusing on increasing the wind limits during load-out and installation of wind turbines and at the same time increasing control and safety. The Boom Lock guidance tool and tagline system was successfully used during the installation of the 15 x MHI Vestas V112 3.3MW turbines at Kentish Flats Extension.

Read the interview with Johan Heiler (PDF) ยป

Design & development by AntennoGoogle+